How We Work

00 01 02 03 04 05 06 07
OW-N's integration into the RIBA plan of work explained.
  • 00 Strategic Definition
  • 01 Preparation & Brief
  • 02 Concept Design
  • 03 Developed Design
  • 04 Technical Design
  • 05 Construction
  • 06 Handover & Close Out
  • 07 In Use
  • Strategic Definition

    We work with you to define the project objectives, scope, and constraints. This includes understanding your vision, budget, and timeline.

  • Preparation & Brief

    We assist in preparing the project brief, ensuring it aligns with your goals. This stage involves site analysis, feasibility studies, and initial risk assessments.

  • Concept Design

    Our team develops initial design concepts that meet the project brief. We explore various design options and present them for your feedback.

  • Developed Design

    We refine the chosen concept design, incorporating your feedback. This stage includes detailed drawings, specifications, and cost estimates.

  • Technical Design

    We produce comprehensive technical designs, including structural, mechanical, and electrical systems. This stage ensures all aspects of the design are coordinated and compliant with regulations.

  • Construction

    We oversee the construction process, ensuring the project is built according to the design and specifications. This includes site supervision, quality control, and managing any changes.

  • Handover & Close Out

    We facilitate the handover of the completed project, ensuring all documentation is in order. This stage includes final inspections, commissioning, and addressing any defects.

  • In Use

    We provide post-occupancy support, helping you manage and maintain the building. This includes performance evaluations and addressing any operational issues.